Skip to content
Register

Past Projects

Andover Park

2023 Community Investment Program Highlights

Park Projects

SuzanJohn Park

The SuzanJohn Park Playground Replacement Project included:

  • Existing playground equipment donated to Kids Around the World. They refurbish and install it for children in a community without access to a playground.
  • New Benches, Picnic Tables, Trash Cans & Bike Racks
  • Wood Fiber Safety Surfacing
  • ADA Accessible Features Include: Harness Swing, Spinner, Sand Digger & Transfer Station

SuzanJohn


Bluegrass Park

The Bluegrass Park Improvement Project included:

  • New 2-5 year old Playground
  • New Seating Area and Site Amenities
  • Native Landscape Restoration
  • Trail/Path extension
  • New Off-Street Parking Lot with 20 spaces and 1 Handicapped

Trail Projects

Trail Improvement Projects


Facility Projects

Little White School Museum Ramp Project

The Oswegoland Park District received a grant from the Illinois Department of Natural Resources (IDNR) for ADA updates to the Little White School Museum. A new wood ramp system begins at the sidewalk off East Jackson Street and wraps around the building to the door at the back of the Museum Gallery.

Little White School Museum Ramp


2022 Community Investment Program Highlights

 

Park Projects

Andover Park

Items completed included the playground, landscaping, basketball court seal coating and striping, and site cleanup and restoration.

Andover Park playground


Eagle Ridge Park

New, premium disc golf baskets replaced the existing baskets at Eagle Ridge Disc Golf Course.

Eagle Ridge


Saw Wee Kee Park

An exciting multi-agency initiative to develop new trail signage and emergency rescue procedures for the popular Saw Wee Kee Park. The trails have been re-designated with a new coloring system, and new signs will be placed in several locations throughout the park. The signs will include trail difficulty, length, wayfinding arrows, and procedures in case of an emergency.

SWK Signage


Summerlin Park

The Summerlin Park Playground Replacement Project included:

  • Existing playground equipment donated to Kids Around the World. They refurbish and install it for children in a community without access to a playground.
  • New Benches, Picnic Tables, Trash Cans & Bike Racks
  • Wood Fiber Safety Surfacing
  • ADA Accessible Features Include: Harness Swings, Spinners, Play Panels & Transfer Stations
  • Playground Features: Sensory Dome Climber & Circuit Climbing System

Veterans Serenity Park

The Veterans Serenity Park project includes a mix of aesthetic, safety, and ADA improvements throughout the park. New features include right-of-way street parking, landscaping, a donor wall monument with plaques and a natural stone façade recognizing those who contributed to the park’s creation, and tension wire railings at the bridges that cross over the dry creek bed. Site grading enhancements will offer more opportunities for brick memorial pavers. This project is being funded with a grant through the Illinois Department of Commerce & Economic Opportunity (DCEO).

Veterans Serenity Park


Washington Park

The Washington Park Playground Replacement Project included:

  • New Benches, Picnic Tables, Trash Cans & Bike Racks
  • Sandbox will be removed Brick pavers will be replaced
  • Wood Fiber Safety Surfacing
  • ADA Accessible Features Include: Harness Swings, Spinners, Play Panels & Transfer Stations
  • Playground Features: Sensory Dome Climber & Roller Slide

Whispering Woods Park

The Whispering Woods Park Playground Replacement Project included:

  • New Benches, Picnic Tables, Trash Cans & Bike Racks
  • Wood Fiber Safety Surfacing
  • ADA Accessible Features Include: Harness Swings, Spinners, Play Panels & Transfer Stations
  • Playground Features: Alpine Slide, Trailblazer Rope Climbing System & ReviWheel Multi-Person Spinner

Trail Projects

Fox River Trail

Repave Portions of the Fox River Trail


Facility Projects

Civic Center

The Civic Center repaving project includes the street parking along Circle Dr. West, the north Civic Center parking lot along Circle Dr. West, and the south Civic Center parking lot along Ashlawn Avenue.


Fox Bend Golf Course

The Fox Bend Golf Course project included renovating course greens #2 and #12, and the tee, green, and bunker on #7. Improvements included new grading, stormwater infrastructure, and irrigation. Holes reopened in summer 2023.


Questions?

If you’d like to know more about any of these projects, please contact the Parks and Planning Department at 630.554.4426 or cmccarty@oswegolandpd.org.

Accessibility Toolbar